
Reference
Conversion and renovation, Siegsdorf
The interior was redesigned after the demolition work. The extensive sewer, masonry and concrete work was carried out in 2008 and 2009. The clay plaster was applied in two layers. After mineral wool thermal insulation was installed, the façade was rendered.
Address
Key facts
Impressed by our previous projects?
Then take a look at our current property offers – your future home may be taking shape right now.

